Today we started converting the bus properly. We’ve removed all of the old metal work from the inside and cleared the area ready for the stage to begin to be built tomorrow.
We’ve started running in electric ringmains for the LED downlighters that will light the bus when it’s used as a workshop space or for meetings.
We’ve also run power to a small LED floodlight above the main door.
The outside of the bus is being stripped back and sanded down ready to be sprayed purple.
So all in all things are going well and tomorrow we hope to have most of the stage built.
Leave a Reply
You must be logged in to post a comment.